RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2505027923 - Archived data from Fri, 05. February 2021 11:11:00 CET


This is all the information about APD 2505027923. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2505027923
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.3 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 176
Position in Box: 31
EP1 batch: 17
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.5522481 V     T = -25 °C: 352.3333097 V
Voltage for Gain 150: T = +20 °C: 396.4139144 V     T = -25 °C: 359.8976884 V
Voltage for Gain 200: T = +20 °C: 400.7831643 V     T = -25 °C: 364.1341366 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.600715313 V-1     T = -25 °C: 4.906302637 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.97918368 V-1     T = -25 °C: 8.794774652 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.04001636 V-1     T = -25 °C: 15.72063466 V-1
Break-through voltage: T = +20 °C: 415.6134374 V     T = -25 °C: 378.9180197 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 09:30:56 CET oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:54 CEST jreher Updated box and position via API.
05. Feb 2021 11:11:00 CET jreher Updated box and position via API.
11. Aug 2020 17:29:48 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:06 CET jreher Updated APD location via API.
25. Nov 2019 17:24:46 CET jreher Updated box and position via API.
18. Jul 2019 10:27:21 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 13:43:47 CEST markus.moritz
05. Jul 2019 14:50:07 CEST jreher Updated APD location via API.
24. Jun 2019 13:05:57 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:08 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:00 CET Tobias Imported from Hamamatsu datasheet.