RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2505027920 - Archived data from Tue, 11. August 2020 17:29:47 CEST


This is all the information about APD 2505027920. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2505027920
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E05
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 377.9 V
Dark current: 4.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 176
Position in Box: 28
EP1 batch: 17
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.7424469 V     T = -25 °C: 343.3260145 V
Voltage for Gain 150: T = +20 °C: 385.5893077 V     T = -25 °C: 350.5221151 V
Voltage for Gain 200: T = +20 °C: 389.9699898 V     T = -25 °C: 354.5479361 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.339122754 V-1     T = -25 °C: 5.004613522 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.714467459 V-1     T = -25 °C: 9.434031661 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.38542817 V-1     T = -25 °C: 15.40888248 V-1
Break-through voltage: T = +20 °C: 406.1397098 V     T = -25 °C: 369.593136 V
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:36:38 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:21:00 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:11:00 CET jreher Updated box and position via API.
11. Aug 2020 17:29:47 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:06 CET jreher Updated APD location via API.
25. Nov 2019 17:24:46 CET jreher Updated box and position via API.
18. Jul 2019 10:27:21 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 13:20:22 CEST markus.moritz
09. Jul 2019 13:20:07 CEST markus.moritz
05. Jul 2019 14:50:06 CEST jreher Updated APD location via API.
24. Jun 2019 13:05:56 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:08 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:00 CET Tobias Imported from Hamamatsu datasheet.