RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2505027911 - Archived data from Tue, 11. August 2020 17:29:46 CEST


This is all the information about APD 2505027911. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2505027911
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E13
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 388.1 V
Dark current: 4.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 176
Position in Box: 20
EP1 batch: 17
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.6531513 V     T = -25 °C: 352.0901736 V
Voltage for Gain 150: T = +20 °C: 395.4720006 V     T = -25 °C: 359.4890234 V
Voltage for Gain 200: T = +20 °C: 399.8099435 V     T = -25 °C: 363.6366674 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.457179342 V-1     T = -25 °C: 4.916824584 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.763559562 V-1     T = -25 °C: 9.250331413 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.5453383 V-1     T = -25 °C: 14.54439108 V-1
Break-through voltage: T = +20 °C: 414.8952809 V     T = -25 °C: 378.5676578 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:10:59 CET jreher Updated box and position via API.
11. Aug 2020 17:29:46 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:05 CET jreher Updated APD location via API.
25. Nov 2019 17:24:45 CET jreher Updated box and position via API.
18. Jul 2019 10:27:57 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 14:50:06 CEST jreher Updated APD location via API.
24. Jun 2019 13:05:56 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:08 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:59 CET Tobias Imported from Hamamatsu datasheet.