RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2505027901 - Archived data from Fri, 05. February 2021 11:10:58 CET


This is all the information about APD 2505027901. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2505027901
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C02
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 176
Position in Box: 10
EP1 batch: 17
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.4217085 V     T = -25 °C: 347.7265214 V
Voltage for Gain 150: T = +20 °C: 390.4819088 V     T = -25 °C: 355.1196612 V
Voltage for Gain 200: T = +20 °C: 394.9629717 V     T = -25 °C: 359.2816077 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.406251798 V-1     T = -25 °C: 4.654320965 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.440056384 V-1     T = -25 °C: 9.417298579 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.48271843 V-1     T = -25 °C: 15.11148328 V-1
Break-through voltage: T = +20 °C: 411.5263044 V     T = -25 °C: 375.00387 V
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:38:04 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 10:31:29 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:58 CET jreher Updated box and position via API.
11. Aug 2020 17:29:44 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:04 CET jreher Updated APD location via API.
25. Nov 2019 17:24:44 CET jreher Updated box and position via API.
18. Jul 2019 10:27:56 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 12:57:32 CEST markus.moritz
05. Jul 2019 14:50:05 CEST jreher Updated APD location via API.
24. Jun 2019 13:05:55 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:07 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:59 CET Tobias Imported from Hamamatsu datasheet.