RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2505027899 - Archived data from Fri, 05. February 2021 11:10:58 CET


This is all the information about APD 2505027899. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2505027899
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C03
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.2 V
Dark current: 7.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 176
Position in Box: 8
EP1 batch: 17
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.0760768 V     T = -25 °C: 346.7281682 V
Voltage for Gain 150: T = +20 °C: 390.0027751 V     T = -25 °C: 354.1698542 V
Voltage for Gain 200: T = +20 °C: 394.4142035 V     T = -25 °C: 358.3499425 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.572876099 V-1     T = -25 °C: 4.672992707 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.043623516 V-1     T = -25 °C: 9.39245607 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.04271227 V-1     T = -25 °C: 14.90239088 V-1
Break-through voltage: T = +20 °C: 410.4259045 V     T = -25 °C: 374.0049124 V
   
Notes:


Version history

Time Author Change comment
07. Feb 2022 10:46:11 CET oafedulidis Assigned to capsule by script
17. May 2021 09:17:32 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:58 CET jreher Updated box and position via API.
11. Aug 2020 17:29:43 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:04 CET jreher Updated APD location via API.
25. Nov 2019 17:24:44 CET jreher Updated box and position via API.
18. Jul 2019 10:27:56 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 12:59:20 CEST markus.moritz
09. Jul 2019 12:59:09 CEST markus.moritz
05. Jul 2019 14:50:05 CEST jreher Updated APD location via API.
24. Jun 2019 13:05:55 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:07 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:59 CET Tobias Imported from Hamamatsu datasheet.