RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2504027884 - Archived data from Fri, 05. February 2021 11:10:57 CET


This is all the information about APD 2504027884. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2504027884
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.5 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 176
Position in Box: 4
EP1 batch: 17
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.5551169 V     T = -25 °C: 344.0545049 V
Voltage for Gain 150: T = +20 °C: 386.4146076 V     T = -25 °C: 351.2300698 V
Voltage for Gain 200: T = +20 °C: 390.8006847 V     T = -25 °C: 355.1508479 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.474691494 V-1     T = -25 °C: 5.823834409 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.716200187 V-1     T = -25 °C: 6.414545771 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.35650428 V-1     T = -25 °C: 16.08153561 V-1
Break-through voltage: T = +20 °C: 406.2069718 V     T = -25 °C: 370.0195304 V
   
Notes:


Version history

Time Author Change comment
20. Oct 2021 09:32:22 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:50 CEST jreher Updated box and position via API.
05. Feb 2021 11:10:57 CET jreher Updated box and position via API.
11. Aug 2020 17:29:43 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:04 CET jreher Updated APD location via API.
25. Nov 2019 17:24:44 CET jreher Updated box and position via API.
18. Jul 2019 10:27:56 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 13:00:53 CEST markus.moritz
05. Jul 2019 14:50:05 CEST jreher Updated APD location via API.
24. Jun 2019 13:05:55 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:07 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:59 CET Tobias Imported from Hamamatsu datasheet.