RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2504027875 - Archived data from Fri, 05. February 2021 11:10:54 CET


This is all the information about APD 2504027875. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2504027875
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C03
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.7 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 175
Position in Box: 29
EP1 batch: 16
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.5560076 V     T = -25 °C: 349.9822022 V
Voltage for Gain 150: T = +20 °C: 393.4374894 V     T = -25 °C: 357.5059676 V
Voltage for Gain 200: T = +20 °C: 397.8226219 V     T = -25 °C: 361.7557034 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.458130776 V-1     T = -25 °C: 4.890492111 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.683971341 V-1     T = -25 °C: 9.088006544 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.4407024 V-1     T = -25 °C: 16.04447106 V-1
Break-through voltage: T = +20 °C: 414.1104779 V     T = -25 °C: 377.2595149 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:30:37 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:54 CET jreher Updated box and position via API.
11. Aug 2020 17:29:41 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:56 CET jreher Updated APD location via API.
25. Nov 2019 17:24:42 CET jreher Updated box and position via API.
03. Sep 2019 11:31:36 CEST jgrochowski Updated APD batch assignment via API.
18. Jul 2019 10:27:55 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 14:50:00 CEST jreher Updated APD location via API.
21. Jun 2019 15:50:46 CEST jgrochowski Updated APD batch assignment via API.
01. Apr 2019 10:41:31 CEST markus.moritz
03. Jan 2019 00:12:07 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:59 CET Tobias Imported from Hamamatsu datasheet.