Show Hamamatsu Avalanche Photo Diode 2504027871 - Archived data from Fri, 05. February 2021 11:10:53 CET
This is all the information about APD 2504027871. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2504027871 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | E13 |
Break-through voltage: | 409 V |
Voltage for Gain 100 (T=+25°C): | 379.8 V |
Dark current: | 4.9 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 175 |
Position in Box: | 26 |
EP1 batch: | 16 |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 19. Feb 2019 |
Sent for analysis after irradiation: | 01. Apr 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 27. Mar 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 27. Mar 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 379.8028208 V T = -25 °C: 344.7994462 V |
Voltage for Gain 150: | T = +20 °C: 387.6760546 V T = -25 °C: 352.1149175 V |
Voltage for Gain 200: | T = +20 °C: 392.0601621 V T = -25 °C: 356.2166002 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.396648088 V-1 T = -25 °C: 4.719994326 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.52010747 V-1 T = -25 °C: 9.609494071 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.79851363 V-1 T = -25 °C: 15.47398643 V-1 |
Break-through voltage: | T = +20 °C: 407.817288 V T = -25 °C: 371.4065088 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
26. Apr 2021 14:30:36 CEST | oafedulidis | Updated box and position via API. |
05. Feb 2021 11:10:53 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:29:40 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 19:59:55 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:24:42 CET | jreher | Updated box and position via API. |
03. Sep 2019 11:31:36 CEST | jgrochowski | Updated APD batch assignment via API. |
18. Jul 2019 10:27:54 CEST | spankonin | Updated APD batch assignment via API. |
05. Jul 2019 14:49:59 CEST | jreher | Updated APD location via API. |
21. Jun 2019 15:50:46 CEST | jgrochowski | Updated APD batch assignment via API. |
01. Apr 2019 10:54:05 CEST | markus.moritz | |
03. Jan 2019 00:12:07 CET | Tobias | Corrected dark current unit. |
12. Jan 2018 13:11:59 CET | Tobias | Imported from Hamamatsu datasheet. |