RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2504027863 - Archived data from Tue, 16. February 2021 12:28:47 CET


This is all the information about APD 2504027863. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2504027863
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.2 V
Dark current: 10.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 175
Position in Box: 34
EP1 batch: 16
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.9416399 V     T = -25 °C: 348.0087239 V
Voltage for Gain 150: T = +20 °C: 390.8214292 V     T = -25 °C: 355.3724913 V
Voltage for Gain 200: T = +20 °C: 395.2097426 V     T = -25 °C: 359.4890537 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.75456884 V-1     T = -25 °C: 4.952183845 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.605176394 V-1     T = -25 °C: 9.415252825 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.00347183 V-1     T = -25 °C: 15.37730454 V-1
Break-through voltage: T = +20 °C: 407.6132823 V     T = -25 °C: 374.8504901 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:03:44 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:47 CET jreher Updated box and position via API.
05. Feb 2021 11:10:53 CET jreher Updated box and position via API.
11. Aug 2020 17:29:39 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:55 CET jreher Updated APD location via API.
25. Nov 2019 17:24:41 CET jreher Updated box and position via API.
03. Sep 2019 11:31:35 CEST jgrochowski Updated APD batch assignment via API.
18. Jul 2019 10:28:28 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 14:49:59 CEST jreher Updated APD location via API.
21. Jun 2019 15:50:46 CEST jgrochowski Updated APD batch assignment via API.
01. Apr 2019 11:17:12 CEST markus.moritz
01. Apr 2019 11:15:36 CEST markus.moritz
03. Jan 2019 00:12:06 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:59 CET Tobias Imported from Hamamatsu datasheet.