RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2504027836 - Archived data from Tue, 11. August 2020 17:29:34 CEST


This is all the information about APD 2504027836. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2504027836
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2007022011/2504027836
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G10
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.7 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 175
Position in Box: 7
EP1 batch: 15
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1823421 V     T = -25 °C: 345.0371748 V
Voltage for Gain 150: T = +20 °C: 388.0524604 V     T = -25 °C: 352.5102179 V
Voltage for Gain 200: T = +20 °C: 392.4087484 V     T = -25 °C: 356.6785048 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.560922351 V-1     T = -25 °C: 4.893549559 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.126764355 V-1     T = -25 °C: 9.125860151 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.27216264 V-1     T = -25 °C: 16.54439213 V-1
Break-through voltage: T = +20 °C: 407.199507 V     T = -25 °C: 371.0409349 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:10:49 CET jreher Updated box and position via API.
11. Aug 2020 17:29:34 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:53:32 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:10 CET jreher Updated box and position via API.
27. Nov 2019 19:59:53 CET jreher Updated APD location via API.
25. Nov 2019 17:24:39 CET jreher Updated box and position via API.
15. Jul 2019 13:03:31 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 14:49:57 CEST jreher Updated APD location via API.
21. Jun 2019 15:54:22 CEST jgrochowski Updated APD batch assignment via API.
01. Apr 2019 13:01:19 CEST markus.moritz
01. Apr 2019 12:22:45 CEST markus.moritz
03. Jan 2019 00:12:05 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:58 CET Tobias Imported from Hamamatsu datasheet.