RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2504027835 - Archived data from Wed, 16. June 2021 16:03:44 CEST


This is all the information about APD 2504027835. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2504027835
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B04
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.2 V
Dark current: 7.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 175
Position in Box: 3
EP1 batch: 15
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.5286069 V     T = -25 °C: 350.1266199 V
Voltage for Gain 150: T = +20 °C: 393.3798196 V     T = -25 °C: 357.6027803 V
Voltage for Gain 200: T = +20 °C: 397.7439086 V     T = -25 °C: 361.7928484 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.42125852 V-1     T = -25 °C: 4.830664995 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.759833519 V-1     T = -25 °C: 9.035501513 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.60275924 V-1     T = -25 °C: 16.12630355 V-1
Break-through voltage: T = +20 °C: 407.8720565 V     T = -25 °C: 376.7117828 V
   
Notes:


Version history

Time Author Change comment
11. Jul 2022 14:25:44 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:03:44 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:00:01 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:52:42 CEST oafedulidis Updated box and position via API.
26. Apr 2021 14:30:34 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:49 CET jreher Updated box and position via API.
11. Aug 2020 17:29:33 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:53 CET jreher Updated APD location via API.
25. Nov 2019 17:24:39 CET jreher Updated box and position via API.
15. Jul 2019 13:03:31 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 14:49:57 CEST jreher Updated APD location via API.
21. Jun 2019 15:54:22 CEST jgrochowski Updated APD batch assignment via API.
01. Apr 2019 13:02:46 CEST markus.moritz
03. Jan 2019 00:12:05 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:58 CET Tobias Imported from Hamamatsu datasheet.