RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2504027829 - Archived data from Fri, 05. February 2021 11:10:47 CET


This is all the information about APD 2504027829. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2504027829
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D14
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.5 V
Dark current: 5.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 174
Position in Box: 29
EP1 batch: 15
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7135296 V     T = -25 °C: 346.4046905 V
Voltage for Gain 150: T = +20 °C: 389.6349837 V     T = -25 °C: 353.8405713 V
Voltage for Gain 200: T = +20 °C: 394.0151108 V     T = -25 °C: 357.9733835 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.358676251 V-1     T = -25 °C: 4.751254176 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.462519061 V-1     T = -25 °C: 9.766653893 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.65554335 V-1     T = -25 °C: 15.60034102 V-1
Break-through voltage: T = +20 °C: 409.6482754 V     T = -25 °C: 372.9841679 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:14:52 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:12:25 CEST oafedulidis Updated box and position via API.
26. Apr 2021 15:22:59 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:47 CET jreher Updated box and position via API.
11. Aug 2020 17:29:32 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:45 CET jreher Updated APD location via API.
25. Nov 2019 17:24:38 CET jreher Updated box and position via API.
15. Jul 2019 13:03:31 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 14:49:52 CEST jreher Updated APD location via API.
21. Jun 2019 15:54:21 CEST jgrochowski Updated APD batch assignment via API.
02. Apr 2019 11:08:29 CEST markus.moritz
03. Jan 2019 00:12:05 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:58 CET Tobias Imported from Hamamatsu datasheet.