RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2504027825 - Archived data from Tue, 11. August 2020 17:29:31 CEST


This is all the information about APD 2504027825. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2504027825
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2504027825/2512028427
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.5 V
Dark current: 4.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 174
Position in Box: 46
EP1 batch: 15
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.5193452 V     T = -25 °C: 346.1185448 V
Voltage for Gain 150: T = +20 °C: 389.3965104 V     T = -25 °C: 353.57079 V
Voltage for Gain 200: T = +20 °C: 393.777569 V     T = -25 °C: 357.7534305 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.42895972 V-1     T = -25 °C: 4.870700539 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.753724513 V-1     T = -25 °C: 9.00830595 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.35116268 V-1     T = -25 °C: 16.05859171 V-1
Break-through voltage: T = +20 °C: 407.6147357 V     T = -25 °C: 372.9842754 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:10:46 CET jreher Updated box and position via API.
11. Aug 2020 17:29:31 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:47:26 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:19 CET jreher Updated box and position via API.
27. Nov 2019 19:59:45 CET jreher Updated APD location via API.
25. Nov 2019 17:24:37 CET jreher Updated box and position via API.
15. Jul 2019 13:03:30 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 14:49:52 CEST jreher Updated APD location via API.
21. Jun 2019 15:54:21 CEST jgrochowski Updated APD batch assignment via API.
02. Apr 2019 11:14:51 CEST markus.moritz
03. Jan 2019 00:12:05 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:58 CET Tobias Imported from Hamamatsu datasheet.