RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2504027818 - Archived data from Mon, 17. August 2020 15:53:33 CEST


This is all the information about APD 2504027818. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2504027818
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.2 V
Dark current: 8.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 174
Position in Box: 39
EP1 batch: 14
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.3221513 V     T = -25 °C: 348.7908958 V
Voltage for Gain 150: T = +20 °C: 392.1871595 V     T = -25 °C: 356.2350677 V
Voltage for Gain 200: T = +20 °C: 396.56792 V     T = -25 °C: 360.416301 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.519484746 V-1     T = -25 °C: 4.638129305 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.935273634 V-1     T = -25 °C: 9.38410398 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.94970142 V-1     T = -25 °C: 14.7724923 V-1
Break-through voltage: T = +20 °C: 408.6575456 V     T = -25 °C: 376.1188912 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:10:45 CET jreher Updated box and position via API.
07. Oct 2020 12:17:07 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:33 CEST jreher Updated box and position via API.
11. Aug 2020 17:29:30 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:44 CET jreher Updated APD location via API.
25. Nov 2019 17:24:37 CET jreher Updated box and position via API.
15. Jul 2019 13:03:30 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 14:49:51 CEST jreher Updated APD location via API.
21. Jun 2019 15:58:12 CEST jgrochowski Updated APD batch assignment via API.
02. Apr 2019 11:30:20 CEST markus.moritz
03. Jan 2019 00:12:05 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:58 CET Tobias Imported from Hamamatsu datasheet.