RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2503027803 - Archived data from Tue, 11. August 2020 17:29:29 CEST


This is all the information about APD 2503027803. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2503027803
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2410026676/2503027803
Unit: #1257 (barcode 1309013609)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.7 V
Dark current: 3.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 174
Position in Box: 30
EP1 batch: 14
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.6644504 V     T = -25 °C: 345.069653 V
Voltage for Gain 150: T = +20 °C: 388.5100671 V     T = -25 °C: 352.4840008 V
Voltage for Gain 200: T = +20 °C: 392.8824778 V     T = -25 °C: 356.6488582 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.428250575 V-1     T = -25 °C: 4.948189848 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.668713928 V-1     T = -25 °C: 9.151990138 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.15327014 V-1     T = -25 °C: 14.50796494 V-1
Break-through voltage: T = +20 °C: 408.7645736 V     T = -25 °C: 372.0060004 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:10:44 CET jreher Updated box and position via API.
11. Aug 2020 17:29:29 CEST jreher Updated APD characteristics via API.
25. Jun 2020 11:22:00 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:41 CET jreher Updated box and position via API.
27. Nov 2019 19:59:44 CET jreher Updated APD location via API.
25. Nov 2019 17:24:36 CET jreher Updated box and position via API.
15. Jul 2019 13:03:29 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 14:49:51 CEST jreher Updated APD location via API.
21. Jun 2019 15:58:11 CEST jgrochowski Updated APD batch assignment via API.
02. Apr 2019 11:41:46 CEST markus.moritz
03. Jan 2019 00:12:04 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:58 CET Tobias Imported from Hamamatsu datasheet.