RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2503027775 - Archived data from Tue, 11. August 2020 17:29:24 CEST


This is all the information about APD 2503027775. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2503027775
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G06
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 375.8 V
Dark current: 3.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 174
Position in Box: 1
EP1 batch: 13
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 374.5972189 V     T = -25 °C: 340.6017762 V
Voltage for Gain 150: T = +20 °C: 382.505752 V     T = -25 °C: 347.8503737 V
Voltage for Gain 200: T = +20 °C: 386.9512622 V     T = -25 °C: 351.9239799 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.266378351 V-1     T = -25 °C: 4.776838457 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.731479081 V-1     T = -25 °C: 9.205792408 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.47815902 V-1     T = -25 °C: 14.6696258 V-1
Break-through voltage: T = +20 °C: 402.7884325 V     T = -25 °C: 366.7275096 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:22:56 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:41 CET jreher Updated box and position via API.
11. Aug 2020 17:29:24 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:41 CET jreher Updated APD location via API.
25. Nov 2019 17:24:34 CET jreher Updated box and position via API.
15. Jul 2019 13:03:12 CEST spankonin Updated APD batch assignment via API.
08. Jul 2019 15:29:49 CEST jreher Updated APD batch assignment via API.
05. Jul 2019 14:49:49 CEST jreher Updated APD location via API.
02. Apr 2019 12:29:54 CEST markus.moritz
03. Jan 2019 00:12:03 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:57 CET Tobias Imported from Hamamatsu datasheet.