Show Hamamatsu Avalanche Photo Diode 2503027770 - Archived data from Fri, 05. February 2021 10:56:07 CET


This is all the information about APD 2503027770. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2503027770
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C12
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 60
Position in Box: 30
EP1 batch: 13
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.8439352 V     T = -25 °C: 351.7463306 V
Voltage for Gain 150: T = +20 °C: 395.5598039 V     T = -25 °C: 359.1440647 V
Voltage for Gain 200: T = +20 °C: 399.8228019 V     T = -25 °C: 363.2774354 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.516580894 V-1     T = -25 °C: 4.678028388 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.955047485 V-1     T = -25 °C: 9.725048226 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.36791821 V-1     T = -25 °C: 15.67593101 V-1
Break-through voltage: T = +20 °C: 414.6512896 V     T = -25 °C: 378.0491061 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:22:12 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:07 CET jreher Updated box and position via API.
03. Feb 2021 18:21:41 CET jreher Updated box and position via API.
11. Aug 2020 17:29:23 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:23 CET jreher Updated APD location via API.
25. Nov 2019 17:15:39 CET jreher Updated box and position via API.
15. Jul 2019 13:03:12 CEST spankonin Updated APD batch assignment via API.
12. Jul 2019 13:55:32 CEST jreher Updated APD location via API.
08. Jul 2019 15:29:49 CEST jreher Updated APD batch assignment via API.
01. Apr 2019 14:29:28 CEST markus.moritz
03. Jan 2019 00:12:03 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:57 CET Tobias Imported from Hamamatsu datasheet.