Show Hamamatsu Avalanche Photo Diode 2503027769 - Archived data from Mon, 25. November 2019 17:15:39 CET
This is all the information about APD 2503027769. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2503027769 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum Box 60 |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | F02 |
Break-through voltage: | 407 V |
Voltage for Gain 100 (T=+25°C): | 378.4 V |
Dark current: | 3.4 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 60 |
Position in Box: | 49 |
EP1 batch: | 13 |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 19. Feb 2019 |
Sent for analysis after irradiation: | 01. Apr 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 27. Mar 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 27. Mar 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
Break-through voltage: | T = +20 °C: none T = -25 °C: none |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 10:56:07 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:21:41 CET | jreher | Updated box and position via API. |
07. Oct 2020 12:26:29 CEST | jreher | Assigned to capsule by script |
17. Aug 2020 15:50:35 CEST | jreher | Updated box and position via API. |
11. Aug 2020 17:29:23 CEST | jreher | Updated APD characteristics via API. |
20. Feb 2020 13:34:54 CET | jreher | Updated box and position via API. |
27. Nov 2019 19:39:23 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:15:39 CET | jreher | Updated box and position via API. |
15. Jul 2019 13:03:12 CEST | spankonin | Updated APD batch assignment via API. |
12. Jul 2019 13:55:32 CEST | jreher | Updated APD location via API. |
08. Jul 2019 15:29:49 CEST | jreher | Updated APD batch assignment via API. |
01. Apr 2019 14:31:20 CEST | markus.moritz | |
03. Jan 2019 00:12:03 CET | Tobias | Corrected dark current unit. |
12. Jan 2018 13:11:57 CET | Tobias | Imported from Hamamatsu datasheet. |