RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2503027769 - Archived data from Mon, 17. August 2020 15:50:35 CEST


This is all the information about APD 2503027769. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2503027769
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F02
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.4 V
Dark current: 3.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 60
Position in Box: 49
EP1 batch: 13
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.3741426 V     T = -25 °C: 343.7320164 V
Voltage for Gain 150: T = +20 °C: 386.2795125 V     T = -25 °C: 351.0480423 V
Voltage for Gain 200: T = +20 °C: 390.7033404 V     T = -25 °C: 355.1762092 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.549095688 V-1     T = -25 °C: 4.873735569 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.921271944 V-1     T = -25 °C: 9.665291554 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.97168131 V-1     T = -25 °C: 15.94709822 V-1
Break-through voltage: T = +20 °C: 406.5891569 V     T = -25 °C: 370.3624109 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:07 CET jreher Updated box and position via API.
03. Feb 2021 18:21:41 CET jreher Updated box and position via API.
07. Oct 2020 12:26:29 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:35 CEST jreher Updated box and position via API.
11. Aug 2020 17:29:23 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:34:54 CET jreher Updated box and position via API.
27. Nov 2019 19:39:23 CET jreher Updated APD location via API.
25. Nov 2019 17:15:39 CET jreher Updated box and position via API.
15. Jul 2019 13:03:12 CEST spankonin Updated APD batch assignment via API.
12. Jul 2019 13:55:32 CEST jreher Updated APD location via API.
08. Jul 2019 15:29:49 CEST jreher Updated APD batch assignment via API.
01. Apr 2019 14:31:20 CEST markus.moritz
03. Jan 2019 00:12:03 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:57 CET Tobias Imported from Hamamatsu datasheet.