RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2503027758 - Archived data from Mon, 03. May 2021 15:19:27 CEST


This is all the information about APD 2503027758. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2503027758
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 383.2 V
Dark current: 3.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 60
Position in Box: 24
EP1 batch: 13
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Dec 2018
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.4299144 V     T = -25 °C: 346.9685055 V
Voltage for Gain 150: T = +20 °C: 390.28044 V     T = -25 °C: 354.3950607 V
Voltage for Gain 200: T = +20 °C: 394.6469508 V     T = -25 °C: 358.5817924 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.525718152 V-1     T = -25 °C: 4.924563607 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.896428846 V-1     T = -25 °C: 9.214321144 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.7370364 V-1     T = -25 °C: 14.4814417 V-1
Break-through voltage: T = +20 °C: 406.2990154 V     T = -25 °C: 373.3838623 V
   
Notes:


Version history

Time Author Change comment
11. Jul 2022 14:25:08 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:19:27 CEST oafedulidis Updated box and position via API.
26. Apr 2021 15:22:12 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:06 CET jreher Updated box and position via API.
03. Feb 2021 18:21:39 CET jreher Updated box and position via API.
11. Aug 2020 17:29:21 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:22 CET jreher Updated APD location via API.
25. Nov 2019 17:15:38 CET jreher Updated box and position via API.
15. Jul 2019 13:03:01 CEST spankonin Updated APD batch assignment via API.
12. Jul 2019 13:55:30 CEST jreher Updated APD location via API.
08. Jul 2019 15:29:48 CEST jreher Updated APD batch assignment via API.
01. Apr 2019 14:53:05 CEST markus.moritz
03. Jan 2019 00:12:03 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:57 CET Tobias Imported from Hamamatsu datasheet.