RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2503027747 - Archived data from Tue, 11. August 2020 17:29:19 CEST


This is all the information about APD 2503027747. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2503027747
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D15
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 385.7 V
Dark current: 4.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 60
Position in Box: 17
EP1 batch: 12
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.9055122 V     T = -25 °C: 350.1607397 V
Voltage for Gain 150: T = +20 °C: 393.7868427 V     T = -25 °C: 357.6465587 V
Voltage for Gain 200: T = +20 °C: 398.139459 V     T = -25 °C: 361.8303926 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.66848856 V-1     T = -25 °C: 4.861545855 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.360665596 V-1     T = -25 °C: 8.88542334 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.71208937 V-1     T = -25 °C: 15.91235866 V-1
Break-through voltage: T = +20 °C: 411.4450732 V     T = -25 °C: 375.3949273 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:22:11 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:05 CET jreher Updated box and position via API.
03. Feb 2021 18:21:38 CET jreher Updated box and position via API.
11. Aug 2020 17:29:19 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:21 CET jreher Updated APD location via API.
25. Nov 2019 17:15:37 CET jreher Updated box and position via API.
15. Jul 2019 13:03:00 CEST spankonin Updated APD batch assignment via API.
12. Jul 2019 13:55:29 CEST jreher Updated APD location via API.
21. Jun 2019 16:13:49 CEST spankonin Updated APD batch assignment via API.
02. Apr 2019 10:14:45 CEST markus.moritz
03. Jan 2019 00:12:03 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:57 CET Tobias Imported from Hamamatsu datasheet.