RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2503027737 - Archived data from Fri, 18. December 2020 14:01:33 CET


This is all the information about APD 2503027737. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2503027737
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.4 V
Dark current: 3.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 60
Position in Box: 18
EP1 batch: 12
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.025972 V     T = -25 °C: 345.9458034 V
Voltage for Gain 150: T = +20 °C: 388.0510646 V     T = -25 °C: 353.2652618 V
Voltage for Gain 200: T = +20 °C: 392.5246405 V     T = -25 °C: 357.3642763 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.637127099 V-1     T = -25 °C: 5.090808849 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.9988451 V-1     T = -25 °C: 9.59644807 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.97938808 V-1     T = -25 °C: 15.713587 V-1
Break-through voltage: T = +20 °C: 408.4796792 V     T = -25 °C: 372.4233002 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:19:15 CET jreher Assigned to capsule by script
05. Feb 2021 10:56:03 CET jreher Updated box and position via API.
03. Feb 2021 18:21:37 CET jreher Updated box and position via API.
18. Dec 2020 14:01:33 CET jreher Updated box and position via API.
11. Aug 2020 17:29:17 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:20 CET jreher Updated APD location via API.
25. Nov 2019 17:15:37 CET jreher Updated box and position via API.
15. Jul 2019 13:02:47 CEST spankonin Updated APD batch assignment via API.
12. Jul 2019 13:55:29 CEST jreher Updated APD location via API.
21. Jun 2019 16:13:48 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:02 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:57 CET Tobias Imported from Hamamatsu datasheet.