RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2503027732 - Archived data from Wed, 03. February 2021 18:21:36 CET


This is all the information about APD 2503027732. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2503027732
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2314025311/2503027732
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381 V
Dark current: 3.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 60
Position in Box: 13
EP1 batch: 12
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 19. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.3230346 V     T = -25 °C: 345.502979 V
Voltage for Gain 150: T = +20 °C: 388.2902565 V     T = -25 °C: 352.9064274 V
Voltage for Gain 200: T = +20 °C: 392.7506421 V     T = -25 °C: 357.0534331 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.563169464 V-1     T = -25 °C: 4.863094284 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.914179341 V-1     T = -25 °C: 9.035868491 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.834282 V-1     T = -25 °C: 16.08094097 V-1
Break-through voltage: T = +20 °C: 409.0755556 V     T = -25 °C: 372.6358729 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:03 CET jreher Updated box and position via API.
03. Feb 2021 18:21:36 CET jreher Updated box and position via API.
03. Sep 2020 14:25:36 CEST jreher Assigned to capsule by script
11. Aug 2020 17:29:16 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:23:29 CET jreher Updated box and position via API.
27. Nov 2019 19:39:20 CET jreher Updated APD location via API.
25. Nov 2019 17:15:36 CET jreher Updated box and position via API.
15. Jul 2019 13:02:46 CEST spankonin Updated APD batch assignment via API.
12. Jul 2019 13:55:28 CEST jreher Updated APD location via API.
21. Jun 2019 16:13:47 CEST spankonin Updated APD batch assignment via API.
02. Apr 2019 10:42:32 CEST markus.moritz
03. Jan 2019 00:12:02 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:57 CET Tobias Imported from Hamamatsu datasheet.