RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2502027684 - Archived data from Wed, 03. February 2021 18:21:35 CET


This is all the information about APD 2502027684. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2502027684
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.4 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 60
Position in Box: 3
EP1 batch: 12
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.3728412 V     T = -25 °C: 348.4031521 V
Voltage for Gain 150: T = +20 °C: 391.1832 V     T = -25 °C: 355.6591256 V
Voltage for Gain 200: T = +20 °C: 395.5197665 V     T = -25 °C: 359.6954294 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.489607447 V-1     T = -25 °C: 4.879199143 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.078018996 V-1     T = -25 °C: 9.354850337 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.70808949 V-1     T = -25 °C: 15.25834572 V-1
Break-through voltage: T = +20 °C: 410.9654904 V     T = -25 °C: 374.5348697 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:22:09 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:02 CET jreher Updated box and position via API.
03. Feb 2021 18:21:35 CET jreher Updated box and position via API.
11. Aug 2020 17:29:15 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:19 CET jreher Updated APD location via API.
25. Nov 2019 17:15:35 CET jreher Updated box and position via API.
15. Jul 2019 13:02:46 CEST spankonin Updated APD batch assignment via API.
12. Jul 2019 13:55:27 CEST jreher Updated APD location via API.
21. Jun 2019 16:13:47 CEST spankonin Updated APD batch assignment via API.
02. Apr 2019 11:00:13 CEST markus.moritz
03. Jan 2019 00:12:02 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:57 CET Tobias Imported from Hamamatsu datasheet.