RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2502027676 - Archived data from Fri, 05. February 2021 10:55:59 CET


This is all the information about APD 2502027676. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2502027676
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G05
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 382.5 V
Dark current: 3.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 296
Position in Box: 42
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.5533695 V     T = -25 °C: 347.3063411 V
Voltage for Gain 150: T = +20 °C: 390.3780345 V     T = -25 °C: 354.7382955 V
Voltage for Gain 200: T = +20 °C: 394.7221653 V     T = -25 °C: 358.8995865 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.410287765 V-1     T = -25 °C: 4.767395324 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.651902405 V-1     T = -25 °C: 9.626852439 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.05838989 V-1     T = -25 °C: 15.34081136 V-1
Break-through voltage: T = +20 °C: 410.0462109 V     T = -25 °C: 374.5413745 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:04:21 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:27:28 CET jreher Updated box and position via API.
05. Feb 2021 11:26:31 CET jreher Updated box and position via API.
05. Feb 2021 10:55:59 CET jreher Updated box and position via API.
03. Feb 2021 18:21:33 CET jreher Updated box and position via API.
11. Aug 2020 17:56:35 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:43:39 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:49 CEST jreher Updated box and position via API.
19. Dec 2019 15:47:39 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:22 CET jreher Updated box and position via API.
27. Nov 2019 19:39:11 CET jreher Updated APD location via API.
25. Nov 2019 17:15:34 CET jreher Updated box and position via API.
25. Nov 2019 15:22:12 CET spankonin Updated APD batch assignment via API.
01. Apr 2019 13:37:16 CEST markus.moritz
03. Jan 2019 00:12:01 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:57 CET Tobias Imported from Hamamatsu datasheet.