RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2502027675 - Archived data from Wed, 03. February 2021 18:21:32 CET


This is all the information about APD 2502027675. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2502027675
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.5 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 59
Position in Box: 46
EP1 batch: 12
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.4018691 V     T = -25 °C: 345.2671395 V
Voltage for Gain 150: T = +20 °C: 387.3580573 V     T = -25 °C: 352.575257 V
Voltage for Gain 200: T = +20 °C: 391.7991019 V     T = -25 °C: 356.6665981 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.492751769 V-1     T = -25 °C: 5.008566905 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.806827131 V-1     T = -25 °C: 9.383018339 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.7566487 V-1     T = -25 °C: 15.03707801 V-1
Break-through voltage: T = +20 °C: 407.5819854 V     T = -25 °C: 371.8735919 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2022 10:54:46 CET oafedulidis Assigned to capsule by script
14. Apr 2021 16:34:20 CEST jreher Updated box and position via API.
05. Feb 2021 10:55:59 CET jreher Updated box and position via API.
03. Feb 2021 18:21:32 CET jreher Updated box and position via API.
11. Aug 2020 17:29:14 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:11 CET jreher Updated APD location via API.
25. Nov 2019 17:15:34 CET jreher Updated box and position via API.
15. Jul 2019 13:02:45 CEST spankonin Updated APD batch assignment via API.
04. Jul 2019 11:13:14 CEST jreher Updated APD location via API.
21. Jun 2019 16:13:47 CEST spankonin Updated APD batch assignment via API.
01. Apr 2019 13:38:18 CEST markus.moritz
03. Jan 2019 00:12:01 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:56 CET Tobias Imported from Hamamatsu datasheet.