RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2502027674 - Archived data from Tue, 11. August 2020 17:29:14 CEST


This is all the information about APD 2502027674. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2502027674
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G04
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 383.7 V
Dark current: 3.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 59
Position in Box: 45
EP1 batch: 12
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.5060944 V     T = -25 °C: 348.5995961 V
Voltage for Gain 150: T = +20 °C: 391.3639663 V     T = -25 °C: 355.9798747 V
Voltage for Gain 200: T = +20 °C: 395.7266731 V     T = -25 °C: 360.0990598 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.535216993 V-1     T = -25 °C: 4.793078559 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.019273181 V-1     T = -25 °C: 9.875547799 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.13136797 V-1     T = -25 °C: 16.1493041 V-1
Break-through voltage: T = +20 °C: 405.0087308 V     T = -25 °C: 375.5590406 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:55:59 CET jreher Updated box and position via API.
03. Feb 2021 18:21:32 CET jreher Updated box and position via API.
11. Aug 2020 17:29:14 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:11 CET jreher Updated APD location via API.
25. Nov 2019 17:15:34 CET jreher Updated box and position via API.
15. Jul 2019 13:02:45 CEST spankonin Updated APD batch assignment via API.
04. Jul 2019 11:13:14 CEST jreher Updated APD location via API.
21. Jun 2019 16:13:47 CEST spankonin Updated APD batch assignment via API.
01. Apr 2019 13:39:58 CEST markus.moritz
03. Jan 2019 00:12:01 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:56 CET Tobias Imported from Hamamatsu datasheet.