Show Hamamatsu Avalanche Photo Diode 2502027667 - Archived data from Wed, 03. February 2021 18:21:31 CET


This is all the information about APD 2502027667. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2502027667
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F14
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.3 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 59
Position in Box: 38
EP1 batch: 11
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.6241322 V     T = -25 °C: 345.49934 V
Voltage for Gain 150: T = +20 °C: 387.6175783 V     T = -25 °C: 352.8121338 V
Voltage for Gain 200: T = +20 °C: 392.0907531 V     T = -25 °C: 356.8914527 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.347817931 V-1     T = -25 °C: 4.836204218 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.437220577 V-1     T = -25 °C: 9.090268316 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.76664399 V-1     T = -25 °C: 16.9125288 V-1
Break-through voltage: T = +20 °C: 407.5739311 V     T = -25 °C: 372.2385069 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:55:58 CET jreher Updated box and position via API.
03. Feb 2021 18:21:31 CET jreher Updated box and position via API.
11. Aug 2020 17:29:13 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:11 CET jreher Updated APD location via API.
25. Nov 2019 17:15:33 CET jreher Updated box and position via API.
15. Jul 2019 13:02:45 CEST spankonin Updated APD batch assignment via API.
04. Jul 2019 11:13:14 CEST jreher Updated APD location via API.
21. Jun 2019 16:14:20 CEST spankonin Updated APD batch assignment via API.
01. Apr 2019 13:50:59 CEST markus.moritz
03. Jan 2019 00:12:01 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:56 CET Tobias Imported from Hamamatsu datasheet.