RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2502027655 - Archived data from Tue, 11. August 2020 17:29:11 CEST


This is all the information about APD 2502027655. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2502027655
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2502027655/2805031162
Unit: #1115 (barcode 1309012503)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 386.9 V
Dark current: 4 nA
   
Screening Logistics:  
Available: No
Storage Box: 59
Position in Box: 27
EP1 batch: 11
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.1860975 V     T = -25 °C: 351.3883635 V
Voltage for Gain 150: T = +20 °C: 395.0276687 V     T = -25 °C: 358.8829328 V
Voltage for Gain 200: T = +20 °C: 399.3893687 V     T = -25 °C: 363.0764013 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.58387271 V-1     T = -25 °C: 4.71888961 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.086090078 V-1     T = -25 °C: 9.692295249 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.29862557 V-1     T = -25 °C: 15.33483037 V-1
Break-through voltage: T = +20 °C: 414.9052027 V     T = -25 °C: 378.4842313 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:55:57 CET jreher Updated box and position via API.
03. Feb 2021 18:21:30 CET jreher Updated box and position via API.
11. Aug 2020 17:29:11 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:59:28 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:18 CET jreher Updated box and position via API.
27. Nov 2019 19:39:10 CET jreher Updated APD location via API.
25. Nov 2019 17:15:33 CET jreher Updated box and position via API.
15. Jul 2019 13:02:33 CEST spankonin Updated APD batch assignment via API.
04. Jul 2019 11:13:13 CEST jreher Updated APD location via API.
21. Jun 2019 16:14:19 CEST spankonin Updated APD batch assignment via API.
01. Apr 2019 14:31:40 CEST markus.moritz
03. Jan 2019 00:12:01 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:56 CET Tobias Imported from Hamamatsu datasheet.