Show Hamamatsu Avalanche Photo Diode 2502027650 - Archived data from Wed, 16. June 2021 15:53:37 CEST


This is all the information about APD 2502027650. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2502027650
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C02
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 59
Position in Box: 22
EP1 batch: 11
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.540596 V     T = -25 °C: 350.787837 V
Voltage for Gain 150: T = +20 °C: 394.3747946 V     T = -25 °C: 358.2969146 V
Voltage for Gain 200: T = +20 °C: 398.7713722 V     T = -25 °C: 362.5051606 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.417955124 V-1     T = -25 °C: 4.873925383 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.680335263 V-1     T = -25 °C: 9.176415453 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.13542915 V-1     T = -25 °C: 14.38632205 V-1
Break-through voltage: T = +20 °C: 411.9629276 V     T = -25 °C: 378.0807508 V
   
Notes:


Version history

Time Author Change comment
19. Nov 2021 13:05:34 CET oafedulidis Assigned to capsule by script
16. Jun 2021 16:04:42 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:00:53 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:53:37 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:55:56 CET jreher Updated box and position via API.
03. Feb 2021 18:21:30 CET jreher Updated box and position via API.
11. Aug 2020 17:29:10 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:09 CET jreher Updated APD location via API.
25. Nov 2019 17:15:32 CET jreher Updated box and position via API.
15. Jul 2019 13:02:32 CEST spankonin Updated APD batch assignment via API.
04. Jul 2019 11:13:12 CEST jreher Updated APD location via API.
21. Jun 2019 16:14:18 CEST spankonin Updated APD batch assignment via API.
01. Apr 2019 14:40:42 CEST markus.moritz
03. Jan 2019 00:12:00 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:56 CET Tobias Imported from Hamamatsu datasheet.