RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2501027637 - Archived data from Wed, 03. February 2021 18:21:29 CET


This is all the information about APD 2501027637. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2501027637
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 379.9 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 59
Position in Box: 15
EP1 batch: 11
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.9012348 V     T = -25 °C: 344.7181614 V
Voltage for Gain 150: T = +20 °C: 387.7856126 V     T = -25 °C: 352.0727106 V
Voltage for Gain 200: T = +20 °C: 392.1765818 V     T = -25 °C: 356.2100899 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.620119005 V-1     T = -25 °C: 4.6509516 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.203131563 V-1     T = -25 °C: 9.59012092 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.46667321 V-1     T = -25 °C: 15.25639529 V-1
Break-through voltage: T = +20 °C: 407.9447862 V     T = -25 °C: 371.4261614 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:55:55 CET jreher Updated box and position via API.
03. Feb 2021 18:21:29 CET jreher Updated box and position via API.
11. Aug 2020 17:29:09 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:09 CET jreher Updated APD location via API.
25. Nov 2019 17:15:32 CET jreher Updated box and position via API.
15. Jul 2019 13:02:32 CEST spankonin Updated APD batch assignment via API.
04. Jul 2019 11:13:12 CEST jreher Updated APD location via API.
21. Jun 2019 16:14:18 CEST spankonin Updated APD batch assignment via API.
01. Apr 2019 14:52:02 CEST markus.moritz
03. Jan 2019 00:12:00 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:56 CET Tobias Imported from Hamamatsu datasheet.