RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2501027625 - Archived data from Tue, 11. August 2020 17:29:07 CEST


This is all the information about APD 2501027625. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2501027625
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.9 V
Dark current: 5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 59
Position in Box: 3
EP1 batch: 10
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.4235766 V     T = -25 °C: 352.8127709 V
Voltage for Gain 150: T = +20 °C: 396.2889983 V     T = -25 °C: 360.4583387 V
Voltage for Gain 200: T = +20 °C: 400.6600912 V     T = -25 °C: 364.7639066 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.441280057 V-1     T = -25 °C: 4.835178834 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.827034667 V-1     T = -25 °C: 8.876084172 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.62074969 V-1     T = -25 °C: 15.42894375 V-1
Break-through voltage: T = +20 °C: 416.236612 V     T = -25 °C: 378.6186441 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:55:54 CET jreher Updated box and position via API.
03. Feb 2021 18:21:28 CET jreher Updated box and position via API.
11. Aug 2020 17:29:07 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:08 CET jreher Updated APD location via API.
25. Nov 2019 17:15:31 CET jreher Updated box and position via API.
15. Jul 2019 13:02:31 CEST spankonin Updated APD batch assignment via API.
04. Jul 2019 11:13:11 CEST jreher Updated APD location via API.
21. Jun 2019 16:15:18 CEST spankonin Updated APD batch assignment via API.
02. Apr 2019 14:43:50 CEST markus.moritz
03. Jan 2019 00:12:00 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:56 CET Tobias Imported from Hamamatsu datasheet.