RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2501027620 - Archived data from Fri, 05. February 2021 10:55:52 CET


This is all the information about APD 2501027620. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2501027620
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B13
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.8 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 58
Position in Box: 30
EP1 batch: 10
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.1917094 V     T = -25 °C: 353.4215222 V
Voltage for Gain 150: T = +20 °C: 397.0186746 V     T = -25 °C: 360.9189115 V
Voltage for Gain 200: T = +20 °C: 401.3500303 V     T = -25 °C: 365.1037609 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.607262362 V-1     T = -25 °C: 4.747178408 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.429417482 V-1     T = -25 °C: 9.773443228 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.90833576 V-1     T = -25 °C: 15.97001854 V-1
Break-through voltage: T = +20 °C: 416.5580639 V     T = -25 °C: 380.1694875 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:30:14 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:55:52 CET jreher Updated box and position via API.
03. Feb 2021 18:21:25 CET jreher Updated box and position via API.
11. Aug 2020 17:29:06 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:00 CET jreher Updated APD location via API.
25. Nov 2019 17:15:30 CET jreher Updated box and position via API.
15. Jul 2019 13:02:19 CEST spankonin Updated APD batch assignment via API.
04. Jul 2019 11:13:07 CEST jreher Updated APD location via API.
21. Jun 2019 16:15:18 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:11:59 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:56 CET Tobias Imported from Hamamatsu datasheet.