RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2501027615 - Archived data from Fri, 05. February 2021 10:55:51 CET


This is all the information about APD 2501027615. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2501027615
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G13
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 387.5 V
Dark current: 4.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 58
Position in Box: 28
EP1 batch: 10
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 27. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.761139 V     T = -25 °C: 351.2107619 V
Voltage for Gain 150: T = +20 °C: 394.6731311 V     T = -25 °C: 358.7203526 V
Voltage for Gain 200: T = +20 °C: 399.0580004 V     T = -25 °C: 362.9271961 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.349351402 V-1     T = -25 °C: 4.765726099 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.615467718 V-1     T = -25 °C: 8.930953969 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.15643638 V-1     T = -25 °C: 16.07857004 V-1
Break-through voltage: T = +20 °C: 410.3021978 V     T = -25 °C: 377.9579954 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:30:13 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:55:51 CET jreher Updated box and position via API.
03. Feb 2021 18:21:24 CET jreher Updated box and position via API.
11. Aug 2020 17:29:05 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:00 CET jreher Updated APD location via API.
25. Nov 2019 17:15:29 CET jreher Updated box and position via API.
15. Jul 2019 13:02:19 CEST spankonin Updated APD batch assignment via API.
04. Jul 2019 11:13:06 CEST jreher Updated APD location via API.
21. Jun 2019 16:15:17 CEST spankonin Updated APD batch assignment via API.
01. Apr 2019 12:59:50 CEST markus.moritz
03. Jan 2019 00:11:59 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:56 CET Tobias Imported from Hamamatsu datasheet.