RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2501027599 - Archived data from Wed, 07. October 2020 12:12:58 CEST


This is all the information about APD 2501027599. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2501027599
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2501027599/0819008704
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F02
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.6 V
Dark current: 4.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 58
Position in Box: 27
EP1 batch: 9
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.3066072 V     T = -25 °C: 346.7596614 V
Voltage for Gain 150: T = +20 °C: 389.3313015 V     T = -25 °C: 354.145739 V
Voltage for Gain 200: T = +20 °C: 393.8136179 V     T = -25 °C: 358.2830546 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.560611875 V-1     T = -25 °C: 4.949819902 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.788156792 V-1     T = -25 °C: 9.690507555 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.75957846 V-1     T = -25 °C: 15.71505978 V-1
Break-through voltage: T = +20 °C: 409.5834904 V     T = -25 °C: 373.1328793 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:55:49 CET jreher Updated box and position via API.
03. Feb 2021 18:21:23 CET jreher Updated box and position via API.
07. Oct 2020 12:12:58 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:26 CEST jreher Updated box and position via API.
11. Aug 2020 17:29:02 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:38:59 CET jreher Updated APD location via API.
25. Nov 2019 17:15:28 CET jreher Updated box and position via API.
15. Jul 2019 13:02:18 CEST spankonin Updated APD batch assignment via API.
04. Jul 2019 11:13:05 CEST jreher Updated APD location via API.
21. Jun 2019 16:15:41 CEST spankonin Updated APD batch assignment via API.
01. Apr 2019 13:29:46 CEST markus.moritz
03. Jan 2019 00:11:59 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:55 CET Tobias Imported from Hamamatsu datasheet.