RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2501027598 - Archived data from Tue, 11. August 2020 17:29:02 CEST


This is all the information about APD 2501027598. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2501027598
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.6 V
Dark current: 4.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 58
Position in Box: 14
EP1 batch: 9
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.9398896 V     T = -25 °C: 343.0003811 V
Voltage for Gain 150: T = +20 °C: 384.847963 V     T = -25 °C: 350.190684 V
Voltage for Gain 200: T = +20 °C: 389.2686784 V     T = -25 °C: 354.2103298 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.829776603 V-1     T = -25 °C: 5.099684642 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.484609568 V-1     T = -25 °C: 9.901029153 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.69416774 V-1     T = -25 °C: 16.24536883 V-1
Break-through voltage: T = +20 °C: 405.6235921 V     T = -25 °C: 369.25013 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:30:12 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:55:49 CET jreher Updated box and position via API.
03. Feb 2021 18:21:22 CET jreher Updated box and position via API.
11. Aug 2020 17:29:02 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:38:59 CET jreher Updated APD location via API.
25. Nov 2019 17:15:28 CET jreher Updated box and position via API.
15. Jul 2019 13:02:18 CEST spankonin Updated APD batch assignment via API.
04. Jul 2019 11:13:05 CEST jreher Updated APD location via API.
21. Jun 2019 16:15:41 CEST spankonin Updated APD batch assignment via API.
01. Apr 2019 13:32:48 CEST markus.moritz
03. Jan 2019 00:11:59 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:55 CET Tobias Imported from Hamamatsu datasheet.