RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2501027594 - Archived data from Wed, 03. February 2021 18:21:22 CET


This is all the information about APD 2501027594. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2501027594
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 383.8 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 58
Position in Box: 10
EP1 batch: 9
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.8516647 V     T = -25 °C: 348.8426243 V
Voltage for Gain 150: T = +20 °C: 391.0094084 V     T = -25 °C: 356.1790342 V
Voltage for Gain 200: T = +20 °C: 395.5565727 V     T = -25 °C: 360.2757385 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.38345595 V-1     T = -25 °C: 4.726833233 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.833526314 V-1     T = -25 °C: 9.843607534 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.89431408 V-1     T = -25 °C: 15.89853981 V-1
Break-through voltage: T = +20 °C: 411.732658 V     T = -25 °C: 375.212612 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:24:39 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:13:10 CEST oafedulidis Updated box and position via API.
26. Apr 2021 14:30:12 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:55:48 CET jreher Updated box and position via API.
03. Feb 2021 18:21:22 CET jreher Updated box and position via API.
11. Aug 2020 17:29:01 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:38:58 CET jreher Updated APD location via API.
25. Nov 2019 17:15:27 CET jreher Updated box and position via API.
15. Jul 2019 13:02:17 CEST spankonin Updated APD batch assignment via API.
04. Jul 2019 11:13:05 CEST jreher Updated APD location via API.
21. Jun 2019 16:15:41 CEST spankonin Updated APD batch assignment via API.
01. Apr 2019 13:41:33 CEST markus.moritz
03. Jan 2019 00:11:59 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:55 CET Tobias Imported from Hamamatsu datasheet.