RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2501027592 - Archived data from Wed, 07. October 2020 16:40:30 CEST


This is all the information about APD 2501027592. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2501027592
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2501027592/2302024296
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: A06
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383 V
Dark current: 8.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 58
Position in Box: 20
EP1 batch: 9
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.647181 V     T = -25 °C: 348.5143741 V
Voltage for Gain 150: T = +20 °C: 391.5749986 V     T = -25 °C: 355.9882435 V
Voltage for Gain 200: T = +20 °C: 395.9823609 V     T = -25 °C: 360.1754806 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.375135617 V-1     T = -25 °C: 4.750211893 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.586393284 V-1     T = -25 °C: 9.61132444 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.96713506 V-1     T = -25 °C: 15.25898462 V-1
Break-through voltage: T = +20 °C: 410.4319655 V     T = -25 °C: 374.7492493 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:55:48 CET jreher Updated box and position via API.
03. Feb 2021 18:21:22 CET jreher Updated box and position via API.
07. Oct 2020 16:40:30 CEST jreher Assigned to capsule by script
17. Aug 2020 15:51:11 CEST jreher Updated box and position via API.
11. Aug 2020 17:29:00 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:35:30 CET jreher Updated box and position via API.
27. Nov 2019 19:38:58 CET jreher Updated APD location via API.
25. Nov 2019 17:15:27 CET jreher Updated box and position via API.
15. Jul 2019 13:02:06 CEST spankonin Updated APD batch assignment via API.
04. Jul 2019 11:13:05 CEST jreher Updated APD location via API.
21. Jun 2019 16:15:40 CEST spankonin Updated APD batch assignment via API.
01. Apr 2019 13:44:32 CEST markus.moritz
03. Jan 2019 00:11:58 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:55 CET Tobias Imported from Hamamatsu datasheet.