RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2501027591 - Archived data from Wed, 03. February 2021 18:21:22 CET


This is all the information about APD 2501027591. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2501027591
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2501027591/2504027816
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: G08
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.7 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 58
Position in Box: 19
EP1 batch: 9
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.1073333 V     T = -25 °C: 343.4903102 V
Voltage for Gain 150: T = +20 °C: 385.9604979 V     T = -25 °C: 350.82246 V
Voltage for Gain 200: T = +20 °C: 390.3306596 V     T = -25 °C: 354.9299604 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.600814808 V-1     T = -25 °C: 4.825392513 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.185769932 V-1     T = -25 °C: 9.951645264 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.45330942 V-1     T = -25 °C: 16.17143258 V-1
Break-through voltage: T = +20 °C: 406.0536742 V     T = -25 °C: 370.2887862 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:55:48 CET jreher Updated box and position via API.
03. Feb 2021 18:21:22 CET jreher Updated box and position via API.
07. Oct 2020 12:19:30 CEST jreher Assigned to capsule by script
06. Oct 2020 16:52:56 CEST jreher Updated box and position via API.
11. Aug 2020 17:29:00 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:38:58 CET jreher Updated APD location via API.
25. Nov 2019 17:15:27 CET jreher Updated box and position via API.
15. Jul 2019 13:02:06 CEST spankonin Updated APD batch assignment via API.
04. Jul 2019 11:13:04 CEST jreher Updated APD location via API.
21. Jun 2019 16:15:40 CEST spankonin Updated APD batch assignment via API.
01. Apr 2019 13:46:46 CEST markus.moritz
03. Jan 2019 00:11:58 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:55 CET Tobias Imported from Hamamatsu datasheet.