RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2501027590 - Archived data from Wed, 03. February 2021 18:21:22 CET


This is all the information about APD 2501027590. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2501027590
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2509028236/2501027590
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: B05
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 379.7 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 58
Position in Box: 18
EP1 batch: 9
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.9386398 V     T = -25 °C: 344.9964536 V
Voltage for Gain 150: T = +20 °C: 387.8211896 V     T = -25 °C: 352.383791 V
Voltage for Gain 200: T = +20 °C: 392.2001901 V     T = -25 °C: 356.5436812 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.645463549 V-1     T = -25 °C: 4.973711196 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.27740943 V-1     T = -25 °C: 9.261744117 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.47849245 V-1     T = -25 °C: 14.67400214 V-1
Break-through voltage: T = +20 °C: 408.0754804 V     T = -25 °C: 372.0559615 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:55:48 CET jreher Updated box and position via API.
03. Feb 2021 18:21:22 CET jreher Updated box and position via API.
07. Oct 2020 12:26:22 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:33 CEST jreher Updated box and position via API.
11. Aug 2020 17:29:00 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:34:53 CET jreher Updated box and position via API.
27. Nov 2019 19:38:58 CET jreher Updated APD location via API.
25. Nov 2019 17:15:27 CET jreher Updated box and position via API.
15. Jul 2019 13:02:06 CEST spankonin Updated APD batch assignment via API.
04. Jul 2019 11:13:04 CEST jreher Updated APD location via API.
21. Jun 2019 16:15:40 CEST spankonin Updated APD batch assignment via API.
01. Apr 2019 13:48:42 CEST markus.moritz
03. Jan 2019 00:11:58 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:55 CET Tobias Imported from Hamamatsu datasheet.