RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2501027582 - Archived data from Wed, 03. February 2021 18:21:21 CET


This is all the information about APD 2501027582. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2501027582
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 378.9 V
Dark current: 4.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 58
Position in Box: 5
EP1 batch: 9
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.8539914 V     T = -25 °C: 343.7302309 V
Voltage for Gain 150: T = +20 °C: 386.7317206 V     T = -25 °C: 351.0956817 V
Voltage for Gain 200: T = +20 °C: 391.1118043 V     T = -25 °C: 355.2334072 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.708521153 V-1     T = -25 °C: 4.704936837 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.31578646 V-1     T = -25 °C: 9.565133652 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.61009976 V-1     T = -25 °C: 15.26162115 V-1
Break-through voltage: T = +20 °C: 407.0358431 V     T = -25 °C: 370.9246875 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 12:53:44 CET oafedulidis Assigned to capsule by script
16. Dec 2021 13:41:48 CET oafedulidis Updated box and position via API.
26. Apr 2021 14:30:11 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:55:47 CET jreher Updated box and position via API.
03. Feb 2021 18:21:21 CET jreher Updated box and position via API.
11. Aug 2020 17:28:59 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:38:57 CET jreher Updated APD location via API.
25. Nov 2019 17:15:27 CET jreher Updated box and position via API.
15. Jul 2019 13:02:05 CEST spankonin Updated APD batch assignment via API.
04. Jul 2019 11:13:04 CEST jreher Updated APD location via API.
21. Jun 2019 16:15:40 CEST spankonin Updated APD batch assignment via API.
01. Apr 2019 14:00:42 CEST markus.moritz
03. Jan 2019 00:11:58 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:55 CET Tobias Imported from Hamamatsu datasheet.