RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2501027573 - Archived data from Wed, 03. February 2021 18:21:20 CET


This is all the information about APD 2501027573. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2501027573
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2516028805/2501027573
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379 V
Dark current: 4.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 58
Position in Box: 2
EP1 batch: 9
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 19. Feb 2019
Sent for analysis after irradiation: 01. Apr 2019
Return for assembly: none
   
Irradiation:  
Date: 27. Mar 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Mar 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.2486115 V     T = -25 °C: 343.9938643 V
Voltage for Gain 150: T = +20 °C: 387.0855182 V     T = -25 °C: 351.3447581 V
Voltage for Gain 200: T = +20 °C: 391.4747567 V     T = -25 °C: 355.4676556 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.534457304 V-1     T = -25 °C: 4.990025117 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.895711154 V-1     T = -25 °C: 9.233690373 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.86119111 V-1     T = -25 °C: 14.67089624 V-1
Break-through voltage: T = +20 °C: 407.0784568 V     T = -25 °C: 370.844265 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:55:46 CET jreher Updated box and position via API.
03. Feb 2021 18:21:20 CET jreher Updated box and position via API.
11. Aug 2020 17:28:57 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:06:39 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:28 CET jreher Updated box and position via API.
27. Nov 2019 19:38:57 CET jreher Updated APD location via API.
25. Nov 2019 17:15:26 CET jreher Updated box and position via API.
15. Jul 2019 13:02:05 CEST spankonin Updated APD batch assignment via API.
04. Jul 2019 11:13:03 CEST jreher Updated APD location via API.
21. Jun 2019 16:15:39 CEST spankonin Updated APD batch assignment via API.
01. Apr 2019 14:18:12 CEST markus.moritz
03. Jan 2019 00:11:58 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:55 CET Tobias Imported from Hamamatsu datasheet.