RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2501027569 - Archived data from Wed, 03. February 2021 18:17:28 CET


This is all the information about APD 2501027569. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2501027569
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2501027569/2404026187
Unit: #1007 (barcode 1309009541)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C03
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.1 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 27
Position in Box: 48
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.1755566 V     T = -25 °C: 345.6690601 V
Voltage for Gain 150: T = +20 °C: 389.0474162 V     T = -25 °C: 353.0987612 V
Voltage for Gain 200: T = +20 °C: 393.4059251 V     T = -25 °C: 357.2801452 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.531900785 V-1     T = -25 °C: 4.77444454 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.852184571 V-1     T = -25 °C: 9.332539641 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.99889673 V-1     T = -25 °C: 14.60012559 V-1
Break-through voltage: T = +20 °C: 409.1700602 V     T = -25 °C: 372.737943 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:22 CET jreher Updated box and position via API.
03. Feb 2021 18:17:28 CET jreher Updated box and position via API.
11. Aug 2020 17:24:11 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:44:08 CEST jreher Assigned to capsule by script
13. Feb 2020 15:25:31 CET jreher Updated box and position via API.
27. Nov 2019 19:34:18 CET jreher Updated APD location via API.
25. Nov 2019 17:13:02 CET jreher Updated box and position via API.
04. Jul 2019 11:09:55 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:28 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:23 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:13:15 CET markus.moritz
03. Jan 2019 00:11:58 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:55 CET Tobias Imported from Hamamatsu datasheet.