RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2501027566 - Archived data from Wed, 05. May 2021 14:07:24 CEST


This is all the information about APD 2501027566. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2501027566
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.3 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 27
Position in Box: 28
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1999924 V     T = -25 °C: 344.8163591 V
Voltage for Gain 150: T = +20 °C: 388.063467 V     T = -25 °C: 352.1944507 V
Voltage for Gain 200: T = +20 °C: 392.4265005 V     T = -25 °C: 356.3386471 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.52174817 V-1     T = -25 °C: 5.126566128 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.86370494 V-1     T = -25 °C: 9.230649101 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.83505915 V-1     T = -25 °C: 14.44253188 V-1
Break-through voltage: T = +20 °C: 408.1009923 V     T = -25 °C: 371.6511309 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:15:41 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 10:30:47 CEST oafedulidis Updated box and position via API.
05. May 2021 14:07:24 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:51:22 CET jreher Updated box and position via API.
03. Feb 2021 18:17:28 CET jreher Updated box and position via API.
11. Aug 2020 17:24:10 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:18 CET jreher Updated APD location via API.
25. Nov 2019 17:13:02 CET jreher Updated box and position via API.
04. Jul 2019 11:09:55 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:27 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:22 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:15:36 CET markus.moritz
03. Jan 2019 00:11:58 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:55 CET Tobias Imported from Hamamatsu datasheet.