RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2501027564 - Archived data from Tue, 16. February 2021 12:28:33 CET


This is all the information about APD 2501027564. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2501027564
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E14
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.5 V
Dark current: 5.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 27
Position in Box: 43
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.6219737 V     T = -25 °C: 349.9985308 V
Voltage for Gain 150: T = +20 °C: 393.4843175 V     T = -25 °C: 357.4871026 V
Voltage for Gain 200: T = +20 °C: 397.8628915 V     T = -25 °C: 361.7027676 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.576412257 V-1     T = -25 °C: 4.587918419 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.590480579 V-1     T = -25 °C: 9.66532726 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.2985044 V-1     T = -25 °C: 15.56443816 V-1
Break-through voltage: T = +20 °C: 413.4993488 V     T = -25 °C: 377.0992264 V
   
Notes:


Version history

Time Author Change comment
14. Apr 2021 14:20:37 CEST jreher Assigned to capsule by script
16. Feb 2021 12:28:33 CET jreher Updated box and position via API.
05. Feb 2021 10:51:21 CET jreher Updated box and position via API.
03. Feb 2021 18:17:28 CET jreher Updated box and position via API.
11. Aug 2020 17:24:10 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:18 CET jreher Updated APD location via API.
25. Nov 2019 17:13:02 CET jreher Updated box and position via API.
04. Jul 2019 11:09:55 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:27 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:22 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:17:11 CET markus.moritz
03. Jan 2019 00:11:57 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:55 CET Tobias Imported from Hamamatsu datasheet.