RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2420027526 - Archived data from Wed, 12. June 2019 16:47:25 CEST


This is all the information about APD 2420027526. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2420027526
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.4 V
Dark current: 4.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 27
Position in Box: 20
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 15:59:40 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:03:11 CEST jreher Updated box and position via API.
05. Feb 2021 10:51:19 CET jreher Updated box and position via API.
03. Feb 2021 18:17:25 CET jreher Updated box and position via API.
11. Aug 2020 17:24:06 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:16 CET jreher Updated APD location via API.
25. Nov 2019 17:13:00 CET jreher Updated box and position via API.
04. Jul 2019 11:09:53 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:25 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:20 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 11:59:28 CET markus.moritz
03. Jan 2019 00:11:57 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:54 CET Tobias Imported from Hamamatsu datasheet.