Show Hamamatsu Avalanche Photo Diode 2420027513 - Archived data from Thu, 17. October 2019 13:41:54 CEST
This is all the information about APD 2420027513. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2420027513 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | assigned to 2420027513/2418027326 |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum Box 27 |
Installation information: | |
Label: | blue |
Manufacturer information: | |
Wafer position: | B08 |
Break-through voltage: | 409 V |
Voltage for Gain 100 (T=+25°C): | 380.2 V |
Dark current: | 5.2 nA |
Screening Logistics: | |
Available: | No |
Storage Box: | 27 |
Position in Box: | 7 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 16. Jan 2019 |
Sent for analysis after irradiation: | 28. Jan 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 21. Jan 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 22. Jan 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
Break-through voltage: | T = +20 °C: none T = -25 °C: none |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 10:51:17 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:17:23 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:24:04 CEST | jreher | Updated APD characteristics via API. |
13. Feb 2020 14:42:50 CET | jreher | Updated box and position via API. |
27. Nov 2019 19:34:15 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:12:59 CET | jreher | Updated box and position via API. |
17. Oct 2019 14:03:13 CEST | tholtmann | Assigned to unit by script |
17. Oct 2019 13:41:54 CEST | tholtmann | Assigned to capsule by script |
04. Jul 2019 11:09:52 CEST | jreher | Updated APD location via API. |
12. Jun 2019 16:47:24 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 16:32:19 CEST | jreher | Updated APD batch assignment via API. |
28. Jan 2019 12:03:05 CET | markus.moritz | |
03. Jan 2019 00:11:56 CET | Tobias | Corrected dark current unit. |
12. Jan 2018 13:11:54 CET | Tobias | Imported from Hamamatsu datasheet. |