RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2420027512 - Archived data from Thu, 03. September 2020 14:25:38 CEST


This is all the information about APD 2420027512. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2420027512
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2420027512/2402026047
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D03
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 27
Position in Box: 6
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.3255195 V     T = -25 °C: 344.2653789 V
Voltage for Gain 150: T = +20 °C: 387.1641855 V     T = -25 °C: 351.5885982 V
Voltage for Gain 200: T = +20 °C: 391.5299943 V     T = -25 °C: 355.7016933 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.708146621 V-1     T = -25 °C: 5.325744587 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.065823426 V-1     T = -25 °C: 9.990726549 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.17590871 V-1     T = -25 °C: 16.31996727 V-1
Break-through voltage: T = +20 °C: 406.6542398 V     T = -25 °C: 370.7145389 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:17 CET jreher Updated box and position via API.
03. Feb 2021 18:17:23 CET jreher Updated box and position via API.
03. Sep 2020 14:25:38 CEST jreher Assigned to capsule by script
11. Aug 2020 17:24:03 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:23:30 CET jreher Updated box and position via API.
27. Nov 2019 19:34:15 CET jreher Updated APD location via API.
25. Nov 2019 17:12:59 CET jreher Updated box and position via API.
04. Jul 2019 11:09:52 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:24 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:19 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:04:15 CET markus.moritz
03. Jan 2019 00:11:56 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:54 CET Tobias Imported from Hamamatsu datasheet.