RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2420027511 - Archived data from Mon, 17. May 2021 09:16:18 CEST


This is all the information about APD 2420027511. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2420027511
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.4 V
Dark current: 4.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 27
Position in Box: 4
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.1285774 V     T = -25 °C: 342.8660612 V
Voltage for Gain 150: T = +20 °C: 385.8768221 V     T = -25 °C: 350.2009361 V
Voltage for Gain 200: T = +20 °C: 390.224302 V     T = -25 °C: 354.2943802 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.775467266 V-1     T = -25 °C: 4.863232182 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.664306603 V-1     T = -25 °C: 9.12019292 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.82971108 V-1     T = -25 °C: 14.50374498 V-1
Break-through voltage: T = +20 °C: 405.3643218 V     T = -25 °C: 369.1599184 V
   
Notes:


Version history

Time Author Change comment
19. May 2022 15:26:41 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:16:18 CEST oafedulidis Updated box and position via API.
05. May 2021 14:07:21 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:51:17 CET jreher Updated box and position via API.
03. Feb 2021 18:17:23 CET jreher Updated box and position via API.
11. Aug 2020 17:24:03 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:15 CET jreher Updated APD location via API.
25. Nov 2019 17:12:59 CET jreher Updated box and position via API.
04. Jul 2019 11:09:52 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:23 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:18 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:05:16 CET markus.moritz
03. Jan 2019 00:11:56 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:54 CET Tobias Imported from Hamamatsu datasheet.