RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2420027489 - Archived data from Thu, 03. January 2019 00:11:55 CET


This is all the information about APD 2420027489. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2420027489
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G12
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 26
Position in Box: 34
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:19:18 CET jreher Assigned to capsule by script
05. Feb 2021 10:51:12 CET jreher Updated box and position via API.
03. Feb 2021 18:17:19 CET jreher Updated box and position via API.
18. Dec 2020 14:01:34 CET jreher Updated box and position via API.
11. Aug 2020 17:23:59 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:06 CET jreher Updated APD location via API.
25. Nov 2019 17:12:56 CET jreher Updated box and position via API.
04. Jul 2019 11:09:46 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:22 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:17 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:26:24 CET markus.moritz
03. Jan 2019 00:11:55 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:54 CET Tobias Imported from Hamamatsu datasheet.